Situation: Marriott wanted to save and restore the adobe lodge building, which was built in the 1930s, back to its...
Situation: Marriott wanted to save and restore the adobe lodge building, which was built in the 1930s, back to its...
Situation: West Sixth, on the corner of Mill and 6th avenue in downtown Tempe had sat unoccupied and only 80%...
Situation: On this renovation project ten 6" Pre-cast hollow-core floor planks had numerous penetrations through them for utilities. Many of...
Project Scope: The addition of a new conveyor system on a mezzanine above existing conveyors was needed to handle their...
It seems fairly common the many dry cleaners end up have some amount of VOC’s accidentally spilled below the slab...
Situation: The 23 story concrete shear wall residential building had 35 spandrel beams that were cored for pipe sleeves below...
Situation: Built in the 1930s, this brick school had fallen into abandonment and disrepair, with damaged masonry at cornices, walls,...
Situation: During the renovation of this sports complex 388 lineal feet of water line located in 3 different areas of...
Situation: SubZero, a manufacturer of kitchen appliances, recently purchased an empty 400,000 SF warehouse on the West side of the...
Situation: Four Aeration Basins in this aging facility were suffering from cracks, spalling, and fractured concrete on the interior and...