Situation: The existing walls could not bear the horizontal soil loads both from a structural and geotechnical point of view. Challenges:...
Situation: The existing walls could not bear the horizontal soil loads both from a structural and geotechnical point of view. Challenges:...
Situation: Wire breaks in the 10' diameter pipes severely limited the capacity of the pipe to withstand internal pressure. The...
Situation: Marriott wanted to save and restore the adobe lodge building, which was built in the 1930s, back to its...
Situation: West Sixth, on the corner of Mill and 6th avenue in downtown Tempe had sat unoccupied and only 80%...
Situation: On this renovation project ten 6" Pre-cast hollow-core floor planks had numerous penetrations through them for utilities. Many of...
Situation: Built in the 1930s, this brick school had fallen into abandonment and disrepair, with damaged masonry at cornices, walls,...
Situation: Four Aeration Basins in this aging facility were suffering from cracks, spalling, and fractured concrete on the interior and...